Intel SRPL8 Manuale Utente Pagina 147

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 228
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 146
SRPL8 Server System Product Guide 147
Processors: Removing and Installing
The profusion carrier supports two processor mezzanine boards. Each mezzanine board provides
four Slot 2 connectors for Pentium III Xeon processors packaged in S.E.C. cartridges.
Unpopulated Slot 2 connectors require front side bus (FSB) termination boards. When removing
and installing processors, read the sections “Front Side Bus (FSB) Termination Board Assembly”
on page 150.
CAUTION
The processors can be extremely sensitive to ESD and always require careful
handling. After removing a processor from a protective wrapper or from a
mezzanine board, place it on a nonconductive, static-free surface. Do not
slide the processor over any surface.
Vedere la pagina 146
1 2 ... 142 143 144 145 146 147 148 149 150 151 152 ... 227 228

Commenti su questo manuale

Nessun commento